Sunday, January 16, 2011

New things to do

Been a long time since I worked on Nakshatra, thanks to the Masters program I enrolled in which kept me busy for a few months now.

Now that it is holidays, I plan to do a few things:
  1. Tune evaluation parameters.
  2. Enable EGTB in the engine.
Before I left, several months ago, I was experimenting with mobility factor changes and left it inconclusively. Time to go ahead and finish it off. EGTB creation code is ready for a long time now. Time to write code to integrate it with the engine.